Systems for cooling of the building.
According to the local climate, natural ventilation can be possible only for a short period of time during the year. All the rest of the time during the season the rooms have to have air conditioning.
Preconditioned outside air supply for each room - 1-3 air changes per hour will be arranged, that will keep comfortable indoor stay. Air filtration in the air handling unit – filtering, dehumidifying and cooling.
Dehumidification will be controlled by dew point temperature, to prevent the condensation in the building envelope.
To lower room temperature, concrete slab will be cooled till 20C by built in chilled water pipes. That will give good thermal stability and lover peak cooling loads.
Water-cooled chiller with heat rejection via heat exchangers to the swimming pool, hot water preheating and outside air. For noise reduction to the surroundings, a chiller is placed in the technical room.
The employee and guest spaces will be air-conditioned by multi split units and mechanical air handling units for basic air exchange.